LNG Chain

Gas transmission pipeline · Barnaul to Gorno-Altaysk

Barnaul-Biysk-Gorno-Altaysk Gas Pipeline

Barnaul-Biysk-Gorno-Altaysk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 325 km long and 1.7 bcm/y of capacity, starting up in 2006. It runs from Barnaul to Gorno-Altaysk. It is owned by Gazprom PJSC.

Length

325 km

Capacity

1.7 bcm/y

1.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 300 mm (12 in)

Route

Barnaul-Biysk-Gorno-Altaysk Gas Pipeline runs from Barnaul to Gorno-Altaysk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Barnaul
To
Gorno-Altaysk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
228 km
GEM pipeline ID
P2282
Start year
2006
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingBarnaul → Gorno-Altaysk3251.7300 mm2006GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies