LNG Chain

Gas transmission pipeline · Egypt

Baltim Field Gas Pipelines

Baltim Field Gas Pipelines is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 18 km long and 5.11 bcm/y of capacity, starting up in 2019. It is owned by General Petroleum Co.

Length

18 km

Capacity

5.11 bcm/y

3.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 660 mm (26 in)

Route

Baltim Field Gas Pipelines runs from Egypt. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Egypt
End country
Egypt
Countries crossed
Egypt
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
12 km
GEM pipeline ID
P7577
Start year
2019
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Sub-Sea PipelineOperatingNot reported185.11660 mm2019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.