LNG Chain

Gas transmission pipeline · Bangladesh

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline is an under construction gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 50 km long, starting up in 2024. It is owned by Gas Transmission Co Ltd (GTCL).

Length

50 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bakhrabad
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
25 km
GEM pipeline ID
P3920
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionBakhrabad → ?50Not reported1067 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.