LNG Chain

Gas transmission pipeline · Ashuganj to Elenga

Ashuganj-Elenga Gas Pipeline

Ashuganj-Elenga Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 124 km long and 3.58 bcm/y of capacity, starting up in 1991. It runs from Ashuganj to Elenga. It is owned by Gas Transmission Co Ltd (GTCL).

Length

124 km

Capacity

3.58 bcm/y

2.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Ashuganj-Elenga Gas Pipeline runs from Ashuganj to Elenga. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ashuganj
To
Elenga
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
128 km
GEM pipeline ID
P0833
Start year
1991
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAshuganj → Elenga1243.58610 mm1991GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.