LNG Chain

Gas transmission pipeline · Anaco to Puerto La Cruz

Anaco-Puerto La Cruz Gas Pipeline

Anaco-Puerto La Cruz Gas Pipeline is an operating gas transmission pipeline in Venezuela. The tracker lists 1 tracked segment, 772 km long and 6.13 bcm/y of capacity, starting up in 1951. It runs from Anaco to Puerto La Cruz. It is owned by PDVSA.

Length

772 km

Capacity

6.13 bcm/y

4.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 305 mm (12 in)

Route

Anaco-Puerto La Cruz Gas Pipeline runs from Anaco to Puerto La Cruz. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Anaco
To
Puerto La Cruz
Start country
Venezuela
End country
Venezuela
Countries crossed
Venezuela
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
91 km
GEM pipeline ID
P3143
Start year
1951
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAnaco → Puerto La Cruz7726.13305 mm1951GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Puerto Bahía LNG TerminalColombiaImportProposedname match
Puerto Brisa LNG TerminalColombiaImportProposedname match
Puerto Cortés LNG TerminalHondurasImportUnder constructionname match
Puerto Sandino FSRUNicaraguaImportUnder constructionname match
Puerto de la Luz LNG TerminalSpainImportCancelledname match
TGS Puerto Galván LNG TerminalArgentinaExportProposedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies