Gas transmission pipeline · Alrar field to Wafa field
Alrar-Wafa Gas Pipeline
Alrar-Wafa Gas Pipeline is an operating gas transmission pipeline crossing Algeria, Libya. The tracker lists 1 tracked segment, 30 km long and 3.07 bcm/y of capacity. It runs from Alrar field to Wafa field.
Length
30 km
Capacity
3.07 bcm/y
2.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Alrar-Wafa Gas Pipeline runs from Alrar field to Wafa field. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Alrar field
- To
- Wafa field
- Start country
- Algeria
- End country
- Libya
- Countries crossed
- Algeria, Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 50 km
- GEM pipeline ID
- P8047
- Start year
- Not reported
- GEM wiki page
- Not reported
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Alrar field → Wafa field | 30 | 3.07 | 406 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.