Gas transmission pipeline · Bacia do Rovuma to Gauteng
African Renaissance Gas Pipeline
African Renaissance Gas Pipeline is a proposed gas transmission pipeline crossing Mozambique, South Africa. The tracker lists 1 tracked segment, 2,600 km long and 22.48 bcm/y of capacity, starting up in 2026. It runs from Bacia do Rovuma to Gauteng. Owners include ENH, Profin Consulting, CNPC and 1 more.
Length
2,600 km
Capacity
22.5 bcm/y
16.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
African Renaissance Gas Pipeline runs from Bacia do Rovuma to Gauteng. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bacia do Rovuma
- To
- Gauteng
- Start country
- Mozambique
- End country
- South Africa
- Countries crossed
- Mozambique, South Africa
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 2,466 km
- GEM pipeline ID
- P2249
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Bacia do Rovuma → Gauteng | 2,600 | 22.5 | 1016 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Mozambique LNG Terminal | Mozambique | Export | Under construction | 7 km | route proximity |
| Rovuma LNG Terminal | Mozambique | Export | Proposed | 7.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.