Gas transmission pipeline · Foligno to Sestino
Adriatica Pipeline
Adriatica Pipeline is a proposed gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 114 km long and 6.94 bcm/y of capacity, starting up in 2027. It runs from Foligno to Sestino. It is owned by Snam Rete Gas SpA.
Length
114 km
Capacity
6.94 bcm/y
5.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Adriatica Pipeline runs from Foligno to Sestino. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Foligno
- To
- Sestino
- Start country
- Italy
- End country
- Italy
- Countries crossed
- Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 110 km
- GEM pipeline ID
- P3108
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Foligno -Sestino (Phase 2) | Proposed | Foligno → Sestino | 114 | 6.94 | 1219 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Snam SpA100%