Gas transmission pipeline · Char Pathailkandi to Char Pathailkandi

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline is an under construction gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 10 km long, starting up in 2025. It runs from Char Pathailkandi to Char Pathailkandi. It is owned by Gas Transmission Co Ltd (GTCL).

Length

10 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

2nd Bangabandhu Railway Bridge Gas Transmission Pipeline runs from Char Pathailkandi to Char Pathailkandi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Char Pathailkandi
To
Char Pathailkandi
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
6.1 km
GEM pipeline ID
P1571
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionChar Pathailkandi → Char Pathailkandi10Not reported914 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.