Country
Gibraltar: LNG infrastructure
Gibraltar has 1 LNG terminal in the Global Energy Monitor tracker. It is an importer, with 0.1 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
no export terminal tracked
Import capacity
0.1 Mtpa
operating regasification
Pipelines
0
crossing this country
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 1 | 0.1 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Gibraltar
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Gibraltar LNG Terminal | Import | Not reported | Operating | 0.1 Mtpa | 1 | 2019 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.