Country
Bulgaria: LNG infrastructure
Bulgaria has 41 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
41
14,618 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Bulgaria
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| AGRS Graf Ignatievo to Hisarya–Banya–Karlovo-Sopot Gas PipelineGraf Ignatievo → Sopot | Bulgaria | Proposed | 54 km | Not reported | 1 | — |
| Balkan Stream Gas PipelineKireevo → Pliska | Bulgaria | Operating | 474 km | 20 bcm/y | 1 | 2020 |
| Beglej-Dermantsi-Batultsi-Kalugerovo PipelineBeglej → Kalugerovo | Bulgaria | Operating | 58 km | Not reported | 1 | 1975 |
| Beglej-Dermantsi-Batultsi-Kalugerovo PipelineBeglej → Kalugerovo | Bulgaria | Operating | 58 km | Not reported | 1 | 2022 |
| Beglej-Dermantsi-Batultsi-Kalugerovo PipelineBeglej → Kalugerovo | Bulgaria | Operating | 0 km | Not reported | 1 | — |
| Bulgaria National Gas Transmission Network | Bulgaria | Operating | 3,276 km | 25.2 bcm/y | 1 | — |
| Bulgaria-Serbia Interconnector Gas Pipeline | Bulgaria, Serbia | Operating | 170 km | 1.8 bcm/y | 1 | 2023 |
| Chiren-Butan Gas Pipeline | Bulgaria | Operating | 41 km | Not reported | 1 | 2024 |
| Chiren-Kozloduy-Oryahovo Gas PipelineChiren → Oryahovo | Bulgaria | Operating | 70 km | 0.35 bcm/y | 1 | 2016 |
| Dobrish-Silistra Gas PipelineDobrish → Silistra | Bulgaria | Operating | 80 km | 0.88 bcm/y | 1 | 2015 |
| Dubnitza–Kyustendil Gas PipelineDubnitza → Kyustendil | Bulgaria | Operating | 34 km | Not reported | 1 | — |
| Eastring Pipeline | Slovakia, Hungary, Romania, Bulgaria, Türkiye | Proposed | 1,208 km | 20 bcm/y | 1 | 2027 |
| Gas Interconnector Bulgaria-RomaniaGiurgiu → Ruse | Romania, Bulgaria | Operating | 30 km | 1.5 bcm/y | 1 | 2013 |
| Gas Interconnector Greece–Bulgaria (IGB)Komotini → Stara Zagora | Greece, Bulgaria | Operating | 184 km | 3 bcm/y | 1 | 2022 |
| Giurgiu-Ruse Gas PipelineMuntenia → Ruse | Romania, Bulgaria | Operating | 26 km | 1.5 bcm/y | 1 | 2016 |
| Gorni Bogrov–Novi Iskar PipelineGorni Bogrov → Novi Iskar | Bulgaria | Proposed | 19 km | Not reported | 1 | 2028 |
| Gorni Bogrov–Novi Iskar PipelineGorni Bogrov → Novi Iskar | Bulgaria | Operating | 19 km | 1.8 bcm/y | 1 | — |
| Ihtiman-Gorni Bogrov Gas PipelineIhtiman → Gorni Bogrov | Bulgaria | Proposed | 50 km | Not reported | 1 | 2028 |
| Ihtiman–Dubnitza Gas PipelineIhtiman → Dubnitza | Bulgaria | Operating | 64 km | Not reported | 1 | — |
| Kardam–Negru Voda Gas PipelineKardam → Negru Voda | Bulgaria | Operating | 12 km | 1.8 bcm/y | 1 | — |
| Kresna-Piperevo Gas PipelineKresna → Piperevo | Bulgaria | Proposed | 85 km | Not reported | 1 | 2028 |
| Kulata-Kresna Gas PipelineKulata → Kresna | Bulgaria | Under construction | 48 km | 1.3 bcm/y | 1 | 2026 |
| Kulata-Nea Missivria Gas PipelineKulata → Nea Missivria | Bulgaria, Greece | Operating | 92 km | Not reported | 1 | — |
| Kulata–Petrich Gas PipelineKulata → Petrich | Bulgaria | Operating | 23 km | Not reported | 1 | — |
| Lozenets–Nedyalsko Loop Gas PipelineLozenets → Nedyalsko | Bulgaria | Operating | 20 km | 1.7 bcm/y | 1 | 2018 |
| Nabucco Gas PipelineAhiboz, Gölbaşı → Baumgarten an der March | Türkiye, Bulgaria, Romania, Austria, Hungary | Cancelled | 3,893 km | 31 bcm/y | 1 | — |
| North Macedonia–Bulgaria Gas PipelineRadovish → Petric | North Macedonia, Bulgaria | Proposed | 110 km | 2.02 bcm/y | 1 | — |
| Panagiurishte-Pirdop Gas PipelineVinogradets → Pirdop | Bulgaria | Operating | 62 km | 0 bcm/y | 1 | 2023 |
| Petrich–Dubnitza Gas PipelinePetrich → Dubnitza | Bulgaria | Operating | 99 km | Not reported | 1 | — |
| Piperevo-Pernik Gas PipelinePiperevo → Pernik | Bulgaria | Proposed | 53 km | Not reported | 1 | 2026 |
| Razlog-Bansko Gas PipelineSimitli → Razlog | Bulgaria | Proposed | 37 km | 0 bcm/y | 1 | 2029 |
| Rupcha-Vetrino Gas PipelineRupcha → Vetrino | Bulgaria | Under construction | 61 km | 4.96 bcm/y | 1 | 2026 |
| Skopje-Kriva Palanka Gas PipelineSkopje → Kriva Palanka | North Macedonia, Bulgaria | Operating | 86 km | Not reported | 1 | — |
| South Stream Gas PipelineAnapa → Tarvisio and Baumgarten an der March | Russia, Bulgaria, Serbia, Hungary, Croatia, Slovakia, Slovenia, Austria, Greece, Italy | Cancelled | 2,380 km | 63 bcm/y | 1 | — |
| Strandja–Lozenets Gas PipelineStrandja → Lozenets | Bulgaria | Operating | 56 km | Not reported | 1 | — |
| Strandja–Malkoclar Gas PipelineStrandja → Malkoclar | Bulgaria, Türkiye | Operating | 16 km | Not reported | 1 | — |
| Svishtov Gas PipelinePavlikeni → Svishtov | Bulgaria | Operating | 42 km | Not reported | 1 | 2022 |
| Trans-Balkan Gas Pipeline | Türkiye, Bulgaria, Romania | Operating | 638 km | 27 bcm/y | 1 | 1988 |
| Valchi Dol–Preselka PipelineValchi Dol → Preselka | Bulgaria | Operating | 23 km | Not reported | 1 | 1975 |
| Valchi Dol–Preselka PipelineValchi Dol → Preselka | Bulgaria | Operating | 23 km | Not reported | 1 | 2022 |
| Varna-Oryahovo Gas PipelineVarna → Oryahovo | Bulgaria | Shelved | 844 km | 42.6 bcm/y | 1 | 2022 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.